Project Description

Project Description

Spike Island, New Café, Gym Building & Refurbishment Works to Block B, Co. Cork

The project was completed in two different phases.

Phase 1 – Entailed the supply and installation of heat pumps for the purposes of heating and cooling the new Café / Gym Building. The installation of water services to the new Café / Gym toilet block and kitchen. Installation of fire hose reels & pipework.

Phase 2 – Re-commissioning and refurbishing existing boilers, oil supply lines and tanks, water services and existing heating system in Block B

Mechanical Installation works for this project include the following:

  • Installation of Water Services
  • Installation of booster pumps & CWS Tanks
  • Installation of LPHW systems.
  • Installation of circulating pumps.
  • Installation of 10,000lt oil tank
  • Installation of oil line
  • BMS
  • Ventilation systems including fabric ducting
  • Air Conditioning
  • Supply & Install Sanitary Ware
  • Testing, Commissioning

Project Details

Architect:

Consulting Engineers: Callaghan Engineering

Main Contractors: Callaghan Engineering

Duration: